Stellar Systems
ETP
All Projects
Utilities · Process Automation

Effluent Treatment
Plant Automation

5 MLD automated ETP with PLC-controlled dosing, aeration and multi-stage filtration — delivering real-time SCADA monitoring and automated compliance reporting.

Capacity 5 MLD
Platform Siemens S7-1500
SCADA WinCC V7
Location Gujarat, India
Sector Industrial Effluent
Project Brief

Project Overview

The client operates a large-scale industrial facility generating high-strength effluent from chemical and dye manufacturing processes. The existing manual treatment process was non-compliant with Gujarat Pollution Control Board (GPCB) discharge norms and relied on operator judgement for dosing decisions — resulting in inconsistent treatment quality and failed compliance checks.

Stellar Systems was engaged to design, supply and commission a fully automated PLC-SCADA solution covering every stage of the 5 MLD ETP — from primary collection and chemical dosing through biological treatment, clarification, filtration and treated water discharge.

Scope of Work

  • Full P&ID review and control philosophy document for all ETP stages
  • Siemens S7-1500 PLC panel design, fabrication, FAT and installation
  • Automated pH correction and coagulant dosing based on inline pH transmitters
  • DO-controlled aeration blower VFD modulation in biological treatment stage
  • Multi-stage pressure sand and activated carbon filtration with auto-backwash sequencing
  • WinCC SCADA with live process mimic, trending, alarms and shift reports
  • GSM/4G remote monitoring panel for off-site management access
  • Automated daily compliance data log for GPCB online reporting submission
  • Operator and maintenance training — 2-day commissioning handover

Technical Approach

The control architecture uses a single Siemens S7-1500 CPU with distributed I/O via PROFINET — keeping field wiring short while maintaining a single point of configuration. All dosing pump speed references are calculated in the PLC from inline pH and flow measurements, eliminating manual set-point guessing. The biological stage blowers are driven by Siemens G120 VFDs modulated against DO transmitter feedback to maintain the 2.0 mg/L set-point regardless of inlet load variations.

The WinCC SCADA provides a full process mimic at the operator workstation plus a secure remote client on a 4G router, allowing plant management to monitor effluent quality, chemical inventory and blower run-hours from anywhere. The compliance module automatically packages the CPCB-specified 15-minute average data into the required XML format for direct upload to the GPCB OCEMS portal.

98%
Compliance Rate
Post-Commissioning
35%
Chemical Dosing
Cost Reduction
Zero
Manual Logs
Required for GPCB
Project Specifications
Client Confidential · Gujarat
Location Surat, Gujarat
Plant Capacity 5 MLD
Effluent Type Chemical / Dye
PLC Platform Siemens S7-1500
Network PROFINET
HMI / SCADA Siemens WinCC V7
Remote Access 4G Router Client
I/O Count ~220 I/O
Drives Siemens G120 VFDs
Compliance GPCB OCEMS
Project Duration 14 Weeks
Delivery Design → FAT → Commission
Field Instrumentation

Instruments Deployed

pH Transmitter
8 Points
DO Transmitter
4 Points
Flow Meter
6 Points
Level Transmitter
12 Points
Pressure Transmitter
6 Points
COD Analyser
2 Online
Turbidity Sensor
3 Points
Motor Starters / VFDs
28 Drives

Have a Similar ETP Project?

Our process automation team can assess your plant and design a compliant, automated solution.

Get in Touch